Airport Master Plan

Airport Master Plan – Update in Progress

The Master Plan update for Hector International Airport started in 2015 and should be finalized in late 2016.

Information will be posted here as it becomes available.

Master Plan Conceptual Development

Master Plan Update Meeting – September 13, 2016

Master Plan Update Meeting – May 10, 2016

Meeting Handout – May 10, 2016

Meeting Information – May 10, 2016

Airport Master Plan – 2002

The following links are for the current Airport Master Plan that was completed in 2002.

Master Plan Summary

Cover & Titlepage

Table of Contents

Preface

Chapter 1 – Inventory

Chapter 2 – Aviation Demand Forecasts

Chapter 3 – Aviation Facility Requirements

Chapter 4 – Airport Development Alternatives

Chapter 5 – Airport Plans

Chapter 5 – Airport Layout Plan – Cover

Chapter 5 – Airport Layout Drawing

Chapter 5 – Northside Landside Facilities

Chapter 5- Terminal Area Drawing

Chapter 5 – Southside Landside Facilities

Chapter 5 – Airport Airspace Drawing

Chapter 5 -Inner Portion of Runway 17 Approach

Chapter 5 -Inner Portion of Runway 35 Approach

Chapter 5 -Inner Portion of Runway 8 Approach

Chapter 5 -Inner Portion of Runway 26 Approach

Chapter 5 -Inner Portion of Runway 17L – 35R Approach – Page

Chapter 5 -Inner Portion of Runway 13-31 Approach

Chapter 5 – On-Airport Land Use Drawing

Chapter 5 – Airport Property Map

Chapter 6 – Financial Plan

Appendix A – Glossary of Terms

Appendix B – New Instrument Approach Procedures

Appendix C – Aircraft Noise Analysis

Appendix D – Runway Safety Area Determination Runway 17-35